
75 Okulova St., Building 2, Spectrum Business Center, Office 214, Perm, Russia
To carry out construction activities, the client and contractor companies need to develop organizational and technological documentation, which must be prepared in accordance with specific regulations and meet a number of requirements set by supervisory authorities. Due to the complexity of the task, companies often face significant difficulties when compiling the document package, as they may lack the necessary knowledge and experience to fully comply with legal standards. To avoid such problems, this task can be entrusted to qualified specialists at PN StroyInnovatsiya, who professionally work in this field and can provide quick and effective assistance in resolving the issue.
The two main packages of organizational and technological documentation are POS (Construction Organization Project) and PPR (Work Execution Project). Secondary documents may include control maps, regulations, and others.
Construction Organization Project (POS) includes a set of documents that define the requirements for project implementation (temporary resources, quantity of materials, sequencing), as well as the types of technologies used to achieve an effective result. In other words, the POS is designed to address organizational issues.
The Work Execution Project (PPR) is developed as a set of documents defining the method for solving the task, focusing on the technical aspects. It provides a detailed review of the types of technologies and operations, monitors the quality of their execution, and ensures the safety of the building construction and the workers involved. The PPR addresses the issues outlined in the POS more thoroughly, taking into account the specifics of each individual project.
When using complex technical equipment such as cranes on-site, it is necessary to develop a PPRk (Work Execution Project for cranes).
Preparation of technological documentation includes the development of a TC (technological card). This type of document specifies the technological equipment used on-site, the procedures for their operation, ensures safe usage, and aims for optimal resource utilization.
Technological cards (TC) can be:
As you can see, preparing documentation involves a number of complexities, the nuances of which can only be understood by a specialist with extensive experience in legislation. To eliminate the risks of errors in developing organizational and technological documentation, entrust the work to professionals — specialists at PN StroyInnovatsiya, who possess the high qualifications necessary for prompt and accurate preparation of the entire document package for your organization.
We have been operating since 2019 and have already established a strong reputation on major projects.
An integrated quality management system compliant with the requirements of GOST R ISO 9001-2015 (ISO 9001:2015) has been implemented in our operations.
Work involving the constant presence of our employees on-site
You determine the required number of our employees based on your needs, taking into account the approved output standards per employee. You send us a request, provide the appropriate number of workstations, and, whenever possible, arrange accommodation and meals.
Combining Remote Work with Partial On-Site Presence
You save costs on transportation, accommodation, and workplace organization for our employees compared to the first method, while minimizing your involvement compared to remote work.
Remote Work
You save on transportation, accommodation, and workplace setup for our employees, but you are required to organize coordination with Construction Control, Technical Supervision, and the Client, as well as ensure feedback communication with our headquarters.
614990, Russia, Perm Krai, Perm, Okulova St., Building 75, Block 2, Spectrum Business Center, Office 214
614067, Russia, Perm Krai, Perm, P.O. Box 4
info@pn-si.ru
+7 (342) 291-93-70