
75 Okulova St., Building 2, Spectrum Business Center, Office 214, Perm, Russia
Construction work on the site must be carried out in full accordance with the project documentation, without which technical discrepancies between the completed structure’s parameters and those specified in the official documents may occur. This applies both to new construction from the ground up and to reconstruction, restoration, or major repairs of a building. Услуга строительного контроля позволит отследить реализацию мероприятий согласно требованиям всех нормативно-правовых актов, технических регламентов и инженерных изысканий.
Carrying out activities without proper compliance with the received technical data regarding local terrain features, layout properties, and the type of materials used can lead to significant deterioration of the building’s characteristics in the future, thereby jeopardizing its integrity and the safety of people inside. Moreover, if discrepancies in energy consumption levels, lighting, energy efficiency violations, or other serious deficiencies are discovered during the inspection of a facility being commissioned, obtaining as-built documentation will simply be impossible. In some cases, errors are identified only during the building’s operation (especially industrial facilities), and if such an inspection reveals non-compliance with urban planning codes, the developer may face serious consequences, including fines or even orders to demolish the building.
With its help, you will have full confidence in compliance with the project documentation and engineering surveys for every activity carried out at the construction site, and you will always be promptly informed of any discrepancies requiring immediate correction before the facility is submitted for inspection by the relevant authorities.
When carrying out construction supervision, PN StroyInnovatsiya relies on Russian Government Resolution No. 468 dated June 21, 2010, and Article 53 of the Urban Planning Code of the Russian Federation.
management of the structure at the construction site;
technologies used, supplied materials, and components;
execution of each stage of the work performed on-site;
acceptance tests;
official documentation of the completed stages.
Fully understanding that all the above tasks can pose significant challenges, we take on their resolution ourselves. We are well-versed in the current requirements of regulatory authorities and the intricacies of the Urban Planning Code, so we know how to avoid potential errors and complete the construction of any building in the shortest possible time in compliance with established standards.
We have been operating since 2019 and have already established a strong reputation on major projects.
An integrated quality management system compliant with the requirements of GOST R ISO 9001-2015 (ISO 9001:2015) has been implemented in our operations.
Work involving the constant presence of our employees on-site
You determine the required number of our employees based on your needs, taking into account the approved output standards per employee. You send us a request, provide the appropriate number of workstations, and, whenever possible, arrange accommodation and meals.
Combining Remote Work with Partial On-Site Presence
You save costs on transportation, accommodation, and workplace organization for our employees compared to the first method, while minimizing your involvement compared to remote work.
Remote Work
You save on transportation, accommodation, and workplace setup for our employees, but you are required to organize coordination with Construction Control, Technical Supervision, and the Client, as well as ensure feedback communication with our headquarters.
614990, Russia, Perm Krai, Perm, Okulova St., Building 75, Block 2, Spectrum Business Center, Office 214
614067, Russia, Perm Krai, Perm, P.O. Box 4
info@pn-si.ru
+7 (342) 291-93-70