Engineering Replacement of launch and reception chambers of SOD DU800 at PPMN Vychegda River of the “Ukhta–Yaroslavl” main pipeline. Technical re-equipment 21.10.2019
Engineering Engineering support for construction of the gas pipeline branch to Elizavetino settlement (Phase II) 10.09.2019